PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Bent Pour stop at the 4th Floor Facing South (1)  (800x600).jpg Bent Pour stop at the 4th Floor Facing South (2)  (800x600).jpg Finished installed the handrails at Stair -4 (1st-4th Floor) Facing East (800x600).jpg Finished installing wire mesh at the slab on grade Facing South (800x600).jpg Finished installing wire mesh at the slab on grade Facing West (800x600).jpg
Next page Bent Pour stop at the 4th Floor Facing South (1)  (800x600)
Bent Pour stop at the 4th Floor Facing South (1) (800x600)